We have now finished an important facility in Santurce for the company Progeco Bilbao. This transport logistics and warehousing company trusted in our professionalism and know-how for the installation of 10 RHL 2030 hydraulic ramps with a load resistance of 16 tonnes, 10 sets of metallic buffers 460x240x100, the installation of 10 retractable shelters 3434 and 10 2800 x 3000 mm sectional doors.
You can see how the final result of our installation turned out in the photos. The loading docks are now fully operational in accordance with the specifications requested by the client.